The works involve the placement of the last central beam structures link on the highway, as well as the concreting and termination of the structures implemented in the first phase.

To do a full cut of the roads in the direction Huelva and Sevilla will take effect, including links Gines-Bormujos (5.0 kilometer) and Umbrete-Bollullos (11.0 kilometer) from Monday 27 to Wednesday 29, from 22:30 to 6:00 the next day.

Is provided a diversion for other traffic will be signposted through the A-8059, A-474 (Bormujos-Bollullos), and A-8062, including links 5 (Gines-Bormujos) and 11 (Umbrete- bollullos). According to the resolution of the General Directorate of Traffic (DGT), during this full cut will be restricted traffic of dangerous goods be used on that stretch of the A-49.

Also in May there will be road closures on Highway occasion of the works. Thus, there will be alternative night of a road cuts, with two-way traffic on the opposite carriageway links between Gines-Bormujos and Umbrete-Bollullos. These will run from Sunday to Thursday from 22:30 to 6:00 the next day, between 4 and 28 May. The organization of which has been coordinated with the DGT, Seville Umbrete municipalities, Bollullos, Espartinas, Gines and Bormujos; as well as the delegation of the Ministry Sevilla Building Board of Andalusia, as holder of the roads that traffic is diverted.